Building on Part 1 foundations, Part 2 covers three critical precision systems: electrical controls, gib alignment, and hydraulic overload protection. Learn weekly testing, monthly inspections, and the 0.001-inch misalignment threshold that cuts die life 25%.
Eighty percent of unplanned press downtime traces back to four foundation systems: air, ACB, clutch and brake, and connection points. This engineering reference documents the specific failure thresholds, inspection intervals, and weekly checklist Sutherland service technicians use on every press audit.